Promateris | Extension and modernization of the Buftea factory
Buftea, Ilfov County | G+1F partial | 16,300sqm | General Designer | 2026 | under authorization

Promateris — a producer of packaging and plastics — set out to extend and modernize its factory at Buftea (Ilfov County). The project did not mean merely adding new halls, but reshaping the factory's entire technological flow and bringing the existing buildings into compliance with fire-safety requirements. PPAE acted as General Designer.

Challenges

Several challenges overlapped. First, the flow: the brief called for a complete rethinking of the production and storage circuit, not a simple extension — the new halls had to be integrated into a coherent flow with the existing ones. Then, compliance: the existing buildings did not hold a fire-safety authorization, and the project had to resolve this through modifications and re-compartmenting that would bring them into compliance. Third, the site: the plot allocated for the extension was, in fact, too small for the required program. And, not least, an MEP challenge: some production equipment releases large amounts of heat, which had to be managed.

Solutions

PPAE made the most of the land, arranging the new storage and production halls and the connecting corridors so that the required program would fit on a tight plot, while preserving the functional flows and accesses. The existing buildings were re-compartmented and locally modified to meet the fire-safety measures and the new technological flow.

The heat released by the equipment was turned from a problem into a resource: waste heat is recovered from the extrusion line — both from the machines' cooling water and from the exhausted warm air — and fed back into the thermal plant to heat the halls; in parallel, the technological cooling of the equipment is maintained. Thus, part of the heating demand is covered by heat that would otherwise have been lost, while the rest is offset through cooling.

Structurally, the project used different systems, chosen according to each hall's requirements: fully precast reinforced concrete, mixed solutions (precast reinforced concrete with steel trusses) and fully steel structures.

Result

For Promateris, an extended and modernized factory, with a rethought technological flow and buildings brought into fire-safety compliance — all on a site where the program barely fit. For PPAE, a complex industrial project in which architecture, structure and building services had to be coordinated closely: from making the most of the land to recovering heat from the technological process.

Are you preparing the extension or modernization of a factory — with a technological flow to rethink, fire-safety requirements and a site that must be used to the full? The PPAE team can support your project from concept to completion. Contact us